1 / 48

While working on your own and tracing pipework in a building, you notice that the pipes enter a service duct. What should you do?

2 / 48

What is the colour of an acetylene cylinder?

3 / 48

Where should acetylene gas-welding bottles be stored when they are not in use?

4 / 48

What should you do if you need additional temporary wiring for your power tools whilst working on site?

5 / 48

When using a blowtorch near to timber, what should you do?

6 / 48

Where should liquefied petroleum gas (LPG) cylinders be positioned when supplying an appliance in a site cabin?

7 / 48

How should extension lead in use on site be positioned?

8 / 48

Who is allowed to install natural gas pipework?

9 / 48

What should be done before a mobile tower is moved?

10 / 48

What is edge protection designed to do?

11 / 48

What must you ensure before using a ladder?

12 / 48

Which two of these activities are likely to need a hot-work permit?

13 / 48

When a new piece of plant has been installed but has not been commissioned, how should it be left?

14 / 48

What guarding is required when a pipe threading machine is in use?

15 / 48

What should you do when using a blowtorch near to flexible pipe lagging?

16 / 48

Apart from the cylinders used in gas-powered forklift trucks, why should liquefied petroleum gas (LPG) cylinders never be placed on their side during use?

17 / 48

When working in a riser, how should access be controlled?

18 / 48

When using oxyacetylene brazing equipment, how should the bottles be positioned?

19 / 48

If you find a coloured wire sticking out of an electrical plug what is the correct action to take?

20 / 48

If you are asked to install high-level ductwork from a platform that has no edge protection and is located above an open stairwell, what should you do?

21 / 48

What is the method of checking for leaks after connecting a liquefied petroleum gas (LPG) regulator to the bottle?

22 / 48

If you are working where welding is being carried out, what should be provided to protect you from welding flash?

23 / 48

If you spill some oil on the floor and you do not have any absorbent material to clean the area, what should you do?

24 / 48

Which of the following statements is true?

25 / 48

What must be clearly marked on all lifting equipment?

26 / 48

What is the most likely risk of injury when cutting a pipe with hand-operated pipe cutters?

27 / 48

What is the recommended maximum height for a free-standing mobile tower?

28 / 48

The use of oxyacetylene equipment is not recommended for which jointing method?

29 / 48

Why is it important to know the difference between propane and butane equipment?

30 / 48

What is the first thing you should do after getting on to the platform of a correctly erected mobile tower?

31 / 48

Who should be present during the pressure testing of pipework or vessels?

32 / 48

When positioning and erecting a stepladder, which of the following is essential for its safe use?

33 / 48

What should you do when using pipe-freezing equipment to isolate a damaged section of pipe?

34 / 48

When do you need to wear eye protection while drilling through a wall?

35 / 48

Which item of electrical equipment does not require portable appliance testing?

36 / 48

Who should carry out pressure testing on pipework or vessels?

37 / 48

When planning a lifting operation, how should the sequence of operations to enable a safe lift be confirmed?

38 / 48

What should you ensure when using an electrically powered threading machine?

39 / 48

Which two of the following are essential safety checks to be carried out before using oxyacetylene equipment?

40 / 48

Why is it essential to take great care when handling oxygen cylinders?

41 / 48

Which item of personal protective equipment (PPE) is designed to protect against infrared radiation damage to the eyes during flame cutting or welding?

42 / 48

When assembling a mobile tower what major hazard must you be aware of?

43 / 48

How should cylinders containing liquefied petroleum gas (LPG) be stored on site?

44 / 48

Which of these statements is true in relation to the safe working load (SWL) of lifting equipment?

45 / 48

What is the main hazard associated with flame-cutting and welding?

46 / 48

What must be done first before any roof work is carried out?

47 / 48

When should you stop carrying out hot works?

48 / 48

How should you position the exhaust of an engine-driven generator that has to be run inside a building?

Your score is

The average score is 60%

Exit

How was the test? Please Submit your Rating and give us a feedback!

Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.

We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.

CSCS Pipefitter Mock Test – Prepare for Safe and Skilled Work in Mechanical Systems

What is the CSCS Pipefitter Test?

The CSCS Pipefitter Specialist Test is part of the Health, Safety and Environment (HS&E) suite, designed for professionals who install, maintain, and repair pipework in industrial, commercial, or domestic environments. It ensures pipefitters understand site safety procedures and the specific risks of their trade.

Why Take a Pipefitter Mock Test?

A CSCS Pipefitter Mock Test gives you the opportunity to:

  • Practise with real-style test questions

  • Identify any knowledge gaps before the actual exam

  • Reinforce vital health and safety rules

  • Boost your confidence and increase your chances of passing

What Topics Are Included?

The test covers general site safety and trade-specific areas such as:

  • Installation of steel, copper, and plastic pipes

  • Jointing methods including welding and brazing

  • Safe handling of tools and heavy materials

  • Working at height and in confined spaces

  • Use of PPE and respiratory protection

  • Awareness of pressure testing and system flushing

  • Hot works permits and fire prevention

Who Should Take This Test?

This mock test is ideal for:

  • Pipefitters and apprentices

  • Mechanical installers and industrial maintenance workers

  • Construction operatives in building services

  • Supervisors and engineers in mechanical trades

Key Benefits:

  • Understand safety standards for pipefitting work

  • Get used to the format of the real CSCS test

  • Improve job-site awareness and practical knowledge

  • Help qualify for the appropriate CSCS card

 


Take the CSCS Pipefitter Mock Test now to sharpen your skills, reinforce your safety knowledge, and move one step closer to certification and success on-site.

Other Specialists Quiz

Leave a Reply

Your email address will not be published. Required fields are marked *