Skill Tests
HS&E TEST
CSCS Operatives Test 9
1 / 50
Mobile access towers should be erected by:
2 / 50
What can cause occupational dermatitis?
3 / 50
The seal between an item of respiratory protective equipment (RPE) and a worker's face is most likely to be affected by which two of the following?
4 / 50
You need to lift a load that is not heavy, but it is so big that you cannot see in front of you. What should you do?
5 / 50
Which one of the following is a safe way of moving a mobile access tower?
6 / 50
When working with materials creating dust, what should be monitored?
7 / 50
What risk does this worker face by using this tool on a regular basis?
8 / 50
How can everyone on site help keep rats away?
9 / 50
What does this sign mean?
10 / 50
Why is it essential to be fully trained before using a cartridge-operated tool?
11 / 50
Which one of the following is most likely to cause stress at work?
12 / 50
What is the purpose of personal fall-arrest equipment?
13 / 50
Can the damage by exposure to noise over a long period of time be reversed?
14 / 50
At what point should excavations be inspected?
15 / 50
What is the main issue with using barrier cream to protect your skin?
16 / 50
What is the main risk to this worker, wearing only these items of personal protective equipment (PPE)?
17 / 50
Which of the following can be an indicator of stress?
18 / 50
What do guard-rails around the top of an excavation prevent?
19 / 50
If there is an emergency while you are on site, what should you do first?
20 / 50
What should you do if the safety rules given in your site induction seem out of date as work progresses?
21 / 50
When creating a risk assessment, the severity of harm is multiplied by what?
22 / 50
If warnings about how to work with hazardous substances are not followed, what is a likely consequence for workers?
23 / 50
A scaffold has collapsed and you saw it happen. What should you say when you are asked about the accident?
24 / 50
A worker spills a large quantity of petrol on their clothes when refuelling a piece of equipment. What should they do?
25 / 50
Accidents on site are often caused by materials falling from vehicles during what process?
26 / 50
Why is it important to be clean shaven when using a half-mask respirator?
27 / 50
What is the meaning of this sign?
28 / 50
If you discover a fire, what is the first thing that you should do?
29 / 50
How should a safety helmet be worn to get maximum protection from it?
30 / 50
What are three early signs of hand-arm vibration syndrome (HAVS)?
31 / 50
Which three statements are reasons why saving energy is important?
32 / 50
Skin burns are most likely to occur when a worker works with which of the following?
33 / 50
What should you do if the electrical equipment you are using cuts out?
34 / 50
What does it mean if the equipment you are using is issued with a prohibition notice?
35 / 50
If a sink on site is blocked and the water supply has failed, what should you do?
36 / 50
Which of the following two statements about moving mobile access towers are correct?
37 / 50
38 / 50
Which two of the following statements about power tools are true?
39 / 50
Loading and storage areas should be located where?
40 / 50
Which of the following statements about gas leaking from a liquefied petroleum gas (LPG) cylinder is true?
41 / 50
Which of the following is one of the leading causes of injury on a construction site?
42 / 50
Identify one of the most common types of accident involving site dumpers.
43 / 50
Prolonged exposure to sunlight could cause what?
44 / 50
Which two of the following are common causes of water pollution on site?
45 / 50
Who should drive company vehicles?
46 / 50
How often is it good practice to carry out repeat face-fit tests for respiratory protective equipment (RPE)?
47 / 50
What is the main risk to this worker, wearing only these items of personal protective equipment?
48 / 50
Where vehicles tip materials into excavations, what could be used as a safety precaution?
49 / 50
What should you do if you need special respiratory protective equipment (RPE) to handle a chemical but no RPE has been provided?
50 / 50
What is a good way of reducing energy use when running heating or cooling systems needed for site accommodation?
Your score is
The average score is 0%
Restart quiz Exit
How was the test? Please Submit your Rating and give a feedback!
Your email address will not be published. Required fields are marked *
Δ